What Happens After I Sign a Solar Contract?

The full timeline from signature to permission to operate, stage by stage.

Updated 2026-02-10

Installation day is one day in a process that usually runs several weeks. Knowing the sequence removes most of the anxiety.

The sequence

Site survey and final design. Engineering and plan set. Permit submission to your city or county. HOA approval where applicable. Installation, typically one to three days for a residential system. Building inspection. Utility interconnection application and permission to operate. Monitoring activation and system walkthrough.

Where delays come from

Permitting timelines and utility interconnection queues vary by jurisdiction and are outside any installer's direct control. What we can control is submitting complete packages the first time and telling you where your project stands.

Solar production, bill offset and payment comparisons vary by home, usage, roof, shading, utility rate schedule and financing terms. Nothing on this site is a guarantee of savings. Pricing comparisons depend on system size, equipment, financing structure and contract terms. Any comparison is only meaningful between comparable systems and comparable financing.

Next step

Questions this guide didn't answer?

Ask us directly. We would rather explain it now than have you find out after signing.